People ring me expecting a straight answer, the way you'd ask the price of a car. A duplex doesn't work that way, but here's the honest range. In Western Sydney, a duplex generally costs $1.1 million to $1.5 million without a basement. Add a basement and that climbs toward $2 million. The real number depends on your land and the finish level your area expects, which is exactly why I won't hand you a number on the first call.
We build custom, one project at a time, and we mostly work cost-plus rather than fixed price. That's a big part of why the range is wide. Here's what actually moves the number, what a real first conversation with us looks like, and how long it takes once you start.
Why we don't quote a price on the first call
Every project is custom. The number depends on your land, your finishes, and what the local market expects your finished product to look like. A duplex with basic finishes on an easy block is a different job to one with a basement on a block where buyers expect a high-end finish to sell.
That's not us being difficult. It's the honest answer, and it's the same answer I'd want if I were the one asking.
What actually moves the price
Two things decide where you land in the range: the area, and the finish level that area expects. In parts of Western Sydney with basic finishes and no land issues, you're looking at around $1.1 million to $1.2 million, sometimes a little higher. In mid-western areas where the market expects a higher finish to sell or hold value, that moves to $1.5 million to $1.6 million. Further west, in higher-spec pockets, duplexes can run up to $2 million, and once a client starts adding extras like automation, the number keeps climbing from there.
These are indicative 2026 ranges for planning purposes only, not a quote. Every site and spec is different, and the only way to get a real number for your block is a feasibility check.
Cost-plus vs fixed price
Most project builders and volume builders quote fixed prices. They can do that because they repeat the same design over and over, and it works well until you want to change something. That's when the variation invoices show up.
We build custom, so we mostly work cost-plus: you pay the actual cost of the build plus our margin, agreed upfront. Across the Australian building industry, cost-plus margins are typically quoted in the 10% to 25% range, most commonly landing around 15% to 20%. We'll talk you through our own figure on the feasibility call rather than publish it here, since it depends on the scope of your project.
Cost-plus means you can genuinely tailor the house as you go, without a fresh variation bill every time you change your mind, whether you're building to sell to an investor or just to suit your own family. If you'd rather have a fixed price, we can do that too, but we need a properly detailed quotation first. If you can't provide that detail, we charge for producing it, and that fee is absorbed back into the project if you go ahead with us.
What the first real conversation looks like
Once you're past "what's it going to cost," the next step is a feasibility call, and what that looks like depends on where you're at. If you don't have land or a design yet, we help you work through it, including connecting you with a designer, because the earlier we're involved, the better the outcome. If you already have a design, we go through your finishes and can put together a proper quotation. If you just want a rough figure, we can give you a ballpark, but it's genuinely rough, and it still depends on the area.
You don't need land in hand before you call. Whether you already own the block or you're still looking, the approach is the same: get us involved early.
How long does it actually take?
A straightforward duplex, once everything's in place, typically takes 8 to 12 months from signing to handover. A basement, a more complex design, or bad weather can push that out a bit. The timeline doesn't change based on cost-plus versus fixed price. We keep it the same either way. Cost-plus reduces your risk. It doesn't slow down your build.
Auzzy Projects is a builder, not a financial adviser. Any mention of cash flow, gearing or returns is general information only — not financial advice. Please speak to a licensed adviser or our specialist partners about your situation.
If you want to see one of these builds finished, our duplex page covers the model in more depth, and a full photo set of a completed duplex is on the projects page.
Common questions
Do I need to already own land before I contact Auzzy?
No. We work with clients at both stages, whether you already hold land or are still land-hunting, and we get involved as early as possible either way.
What's the difference between cost-plus and fixed price for a duplex?
Fixed price locks in a number but hits you with variation charges if you change anything. Cost-plus covers the actual build cost plus an agreed margin, which lets you adjust the project as you go without a fresh markup every time.
Why won't you just give me a number over the phone?
Because it would be a guess dressed up as a quote. The price depends on your land and the finish level your area expects. We'd rather get that right on a feasibility call than hand out a number that doesn't hold up.
How long does a duplex take to build in Western Sydney?
Typically 8 to 12 months from signing to handover, a little longer for basements, complex designs, or bad weather.